Sites should prepare specifications that OEMs/suppliers confirm are met for flammable liquid lines on mobile plant. These engineering specifications should meet site requirements for filling, operation, maintenance and integrity during normal and any incident/emergency situation.
Last Updated: 23/01/2023 02:50:57pm